Sign In | Join Free | My spintoband.com
China Hangzhou Nante Machinery Co.,Ltd. logo
Hangzhou Nante Machinery Co.,Ltd.
Hangzhou Nante Machinery Co.,Ltd. Lifting your business, lifting your success!
Active Member

16 Years

Home > Manual Chain Hoist >

5t-6m Manual Chain Hoist CH-G Type for Heavy Duty Lifting

Hangzhou Nante Machinery Co.,Ltd.

5t-6m Manual Chain Hoist CH-G Type for Heavy Duty Lifting

Place of Origin : Zhejiang, China

Brand Name : Nante

Model Number : CH-G

Certification : ISO9001:2008

MOQ : 1

Price : N/A

Packaging Details : Container packing

Delivery Time : Based on client's needs

Payment Terms : L/C, T/T

Supply Ability : 500000 Sets per Year

Brand : Nante

Model : CH-G

Certificate : ISO9001-2008,CE

Material : 20M2

Contact Now

Manual Chain Hoist CH-G Type for Heavy Duty Lifting:

Lifting capacity

0.5~10ton

Lifting Height

3-6m

Lifting Speed

2.5/10 m/min

Manual chain hoists/hand chain block are commonly known as chain blocks and are designed for heavy duty lifting and materials handling operation tasks. Manual chain blocks raise and lower loads by pulling on the hand chain. Chain blocks can be of single or double fall configurations depending on the capacity of the block.

Manual chain block chain hoist with high quality, made by manufacture:
1. The heavy duty top and bottom hook with casted safety latch.
2. Double pawl to increase the safety protection and ensure the hoist for reliable operation.
3. The ball bearing ensure the better mechanical efficiency.
4. Overload protection device is available.
5. Capacity Load: From 0.5T to 20T
6. Standard Lift: Fro 3M to 6M
7. Safe and reliable, durable
8. Have good performance, easy to use and easy to repair
9. (be) reasonably structured, smooth running, good appearance

General Drawing or Sketch or Draft Drawing

5t-6m Manual Chain Hoist CH-G Type for Heavy Duty Lifting

Model

CHG025

CHG050

CHG100

CHG150

CHG200

CHG300

CHG300D

CHG500

CHG750

CHG1000

CHG1500

CHG2000

CHG2500

Capacity (ton)

0.25

0.5

1

1.5

2

3

3

5

7.5

10

15

20

25

Standard Lift

(m)

2.5

2.5

2.5

2.5

2.5

3

3

3

3

3

3

3

3

Running Test Load ( Kn)

3.75

7.5

15

22.5

30

45

45

75

112.5

150

225

250

312.5

Effort Required

to Lift Max.

Load (N)

235

240

250

265

335

372

290

360

368

382

378

382

387

Headroom

(Drawn close up) Hmin (mm)

280

345

376

442

470

548

565

688

690

765

900

950

950

No. of Falls

of Load Chain

1

1

1

1

1

1

2

2

3

4

6

8

10

Load Chain (mm)

4x12

5x15

6x18

7x21

8x24

10x30

7x21

10x30

10x30

10x30

10x30

10x30

10x30

Dimensions (mm)

A

114

132

151

173

175

205

176

189

189

189

189

189

200

B

121

148

172

196

210

255

230

280

433

463

776

900

970

C

280

345

376

442

470

548

565

688

690

765

900

950

980

D

31

35

40

45

50

55

55

65

67

85

95

106

106

K

21

23

27

33

35

39

39

45

47

54

70

80

82

Net Weight (kg)

6.2

11

12.5

17.8

19.5

35

29

41.3

62

78.5

135

190

215

The operational approach:

1. Do not overload the cable.

2. Operation with power other than human power is strictly prohibited.

3. Before use, make sure that the machine parts are intact, the transmission part and lifting chain are well lubricated, and the idling condition is normal.

4. Before lifting, worker have to check whether the upper and lower hooks are fastened. The lifting chain should be hung vertically without any wrong twisted link.

5. The operator should stand in the same plane as the hand sprocket wheel and drag the hand chain, so that the hand sprocket wheel rotates clockwise to raise the weight; Reverse pull the chain, the weight can slowly fall.

6. When lifting heavy objects, it is strictly forbidden for personnel to do any work or walk under the heavy objects to avoid serious accidents.

7. In the lifting process, no matter the weight rises or falls, the force should be uniform and slow when pulling the chain, not too hard, so as to avoid the movement of the chain or the clasp.

8. If the operator finds that the hand tension is higher than the normal tension, he should stop using it immediately. Prevent damage to the internal structure, to prevent the accident of falling objects.

9. After landing the heavy object safely and firmly, take the hand and pull the lower hook of the gourd.

10. After use, hoist should be gently handled and placed in a dry and ventilated place. Apply lubricating oil and put it away.


5t-6m Manual Chain Hoist CH-G Type for Heavy Duty Lifting


Product Tags:

chain hoist manual

      

manual hoist trolley

      
Wholesale 5t-6m Manual Chain Hoist CH-G Type for Heavy Duty Lifting from china suppliers

5t-6m Manual Chain Hoist CH-G Type for Heavy Duty Lifting Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Hangzhou Nante Machinery Co.,Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0